Sprint · GenAI
GenAI POC SprintRAG or chatbot, in production.
A production-ready RAG system or domain-specific chatbot — grounded, evaluated, and deployed. The fastest path from 'we should try GenAI' to 'we have GenAI in production'.
4–6 weeksGenAI
Who it's for
Is this sprint for you?
- Companies with private knowledge that customers/employees ask about
- Teams who tried demos and want a real deployment
- Use cases bounded enough to ship in 4-6 weeks
Deliverables
What you walk away with.
- Production RAG application (or chatbot)
- Ingestion pipeline for your data sources
- Hybrid retrieval on Azure AI Search
- Evaluation harness with groundedness metrics
- Quality dashboard
- Source code in your repo
- 30-day support window
Timeline
Week-by-week — 4–6 weeks.
- 01
Week 1 — Discover
Data inventory, success metrics, architecture decision (prompt vs. RAG vs. fine-tune), eval strategy.
- 02
Weeks 2–3 — Build core
Ingestion pipeline, retrieval logic, prompt engineering, evals, thin pilot UI.
- 03
Week 4 — Iterate
Eval-driven tuning, content safety, PII handling, observability.
- 04
Weeks 5–6 — Harden
Production deployment, FinOps optimizations, runbook, knowledge transfer. Optional based on scope.
Stack
What we use.
The Microsoft AI ecosystem we lean on for this sprint.
Primary stackAzure OpenAIAzure AI SearchAzure AI FoundryDocument IntelligencePromptFlow
Scope
What's not included.
We're explicit about scope so you can decide whether you need to scale up — or stop here.
- Multi-agent orchestration (see Agent Pilot)
- Net-new model fine-tuning (separate engagement)
FAQ
Common questions.
- How much data is too much for 4-6 weeks?
- Anything below ~10M documents is comfortable. Above that we still ship, but the ingestion pipeline becomes the longer pole — plan for the 6-week scope or split into phases.
- Do you ship the UI?
- We ship a thin pilot UI sufficient to validate. Production-grade UI/UX is a separate workstream we can bring in or hand off.
Ready to scope your GenAI POC Sprint?
A discovery brief is enough to confirm fit and start the 5-day clock.